| Day-one power plan | Show supply, contracts, ramp schedule, grid impact, dedicated generation timing, and backup plan. |
| No hidden ratepayer costs | Publicly disclose who pays for generation, wires, substations, interconnections, studies, and delays. If residential bills are expected to change, identify which charge changes, by how much, and why. |
| Power plant second-life plan | If a project brings its own generation, disclose whether the plant can export to Alberta, who owns the interconnection, who carries fuel/water/emissions obligations, and who pays if the plant is retired. |
| Promised → Actual power costs | Before approval, publish the expected cost allocation. After energization, publish what was actually charged to the project and what, if anything, entered general system or ratepayer costs. |
| Water balance | Separate data centre cooling, power plant water, domestic water, fire protection, wastewater, and discharge. |
| Mitigation costs follow the project | If a new private load creates new emissions, water-treatment, grid, road, noise, or other mitigation costs, those costs should principally be built into the project rather than shifted to taxpayers or existing ratepayers. |
| Property-line noise verification | Model before approval, measure after construction, enforce limits, publish complaint process. |
| Land-use transparency | Show zoning, planning history, farmland impact, buffers, traffic, servicing, and cumulative impact. |
| Binding Alberta benefit | Local procurement, apprenticeship seats, tax clarity, permanent job reporting, and public-interest compute access where appropriate. |
| Canadian Compute Contract | Foreign-controlled gigawatt-scale AI campuses should sign a Canadian Compute Dividend pledge before the application is accepted as complete, with a roughly 5% compute-equivalent benefit for Canadian public-interest users. |
| AI Prosperity Fund | Gigawatt-scale AI projects should make a defined, durable contribution to an independently managed public investment fund so Albertans and Canadians accumulate an ownership stake in the productivity created by the infrastructure they host. |
| Independent monitor | Paid by the project, reporting to the public, municipality, and province. Not corporate self-marking. |
| Cleanup security | Posted up front, updated as the project grows, and attached to the asset through sale or bankruptcy. |